absorbing tower

英 [əbˈzɔːbɪŋ ˈtaʊə(r)] 美 [əbˈzɔːrbɪŋ ˈtaʊər]

网络  脱碳塔; 吸收塔

化学



双语例句

  1. Filler absorbing tower is an important unit operation in chemical engineering.
    填料吸收塔是化工过程常用的一种单元操作。
  2. The principle and scheme of selective control on process variables of LPG absorbing tower by use of DCS is explained in detail, including the selection and implementation of field instrument.
    本文详细介绍了应用DCS对液化气吸收塔的工艺参数实现选择性控制的原理和方案,以及现场仪表的选型和实施。
  3. Filler height simulation of absorbing tower in methylamine production
    甲胺生产中吸收塔填料高度的计算机模拟
  4. A dual absorbing tower shower containing oxidant and alkaline absorbant was used for removing arsine, phosphorus, sulfur, fluorine, chlorine and oxynitrides.
    用椭圆型喷淋吸收塔,氧化剂、碱吸收治理半导体工业废气中砷、磷、硫、氟、氯、氮氧化物及各种酸。
  5. Quality control during the installation of desulfurization absorbing tower
    脱硫吸收塔安装过程的质量控制
  6. The structure and load form of the absorbing tower is complex and regular design and calculation method cannot give its distribution condition of the stress and deformation.
    脱硫吸收塔结构及荷载形式复杂,常规设计计算方法不能给出其应力和变形分布情况。
  7. Analytical Calculation for Height of Packing Layer in Absorbing Tower
    吸收塔填料层高度的解析计算
  8. Increasing the inlet gas temperature of CO2 absorbing tower;
    吸收塔进口工艺气温度的调整;
  9. Discussion on Desorption Layer in the Nonisothermal Absorbing Tower
    吸收器内出现非等温吸收解析层的讨论
  10. Strictly control the water equilibrium of absorbing tower;
    严格控制吸收塔的水平衡,确保除雾器的安全运行;
  11. Applied Research on Dense Bed Absorbing Tower in Uranium Mine Shaft
    密实床吸附塔在铀矿山井下的应用研究
  12. The Port Kembla Copper ( PKC) copper smelting facilities were commissioned during 2000. Numerous difficulties were encountered during the commissioning such as multiple reactor tuyere line failures, absorbing acid tower refractory collapse, and Noranda Reactor and Mitsubishi Converter process control problems.
    改建的肯布拉港铜冶炼厂2000年投入运行。试车时遇到很多问题,例如诺兰达炉风口区多次烧穿、吸收塔耐火材料崩落以及诺兰达炉和三菱吹炼炉工艺控制出现问题。
  13. Corrosion of the Feed Preheater on the CO_2 Absorbing Tower and Pretection
    二氧化碳吸收塔进料预热器的腐蚀与防护
  14. By adopting FORTRAN language to simulate and calculate the absorbing tower of methylamine tail gas, the filler height and composition of tail gas can be got.
    用FORTRAN语言设计程序,对甲胺尾气吸收塔进行模型拟计算,求解出填料吸收塔的填料高度及尾气的组成。
  15. A Fuzzy-PI Compound Control System for Urea Absorbing Tower
    尿素吸收塔Fuzzy-PI复合控制系统
  16. Application of purification technology of hydrogen chloride complex absorbing tower
    组合氯化氢吸收塔净化技术的应用
  17. Mass Transfer Models in Bubble Column I.Theoretical Models of Bubble-type Absorbing Tower
    鼓泡塔传质模型&Ⅰ.鼓泡型吸收塔理论模型
  18. The ash content of black liquor gasification contained basic compounds like Na2CO3, Na2S. The basic compounds mixed with circulation absorbing liquid from alkali adsorption tower.
    黑液气化灰分含有碳酸钠、硫化钠等碱性物质,它们进入溶解室后,与来自碱吸收塔的循环吸收液混合,得到含有碳酸钠、硫化钠和氢氧化钠的碱性水溶液。